I had hoped to have finished this
jumper by now but unfortunately I have had to work long hours this week
including working on my day off – so I have not made as much progress as I would
have liked.
I have knitted the back as one
piece and the front as one piece and then I intend to join the sleeves at the
top before adding ribs to the ends.
To give more room under the arms
and to finish the neck opening at the front – I have used triangles.
I thought things were going quite
well, but I have realised that when I thought the sleeves were 5 squares long I
had not counted the column of squares that end with the triangle – and so the
sleeves should be 6 squares long. However, this is the advantage of modular
knitting – I can fix it. I will add
squares to the end of the sleeves before adding the rib.
To end on a more positive note –
I am pleased with the colour of the jumper – I think you could call it
brown. I have managed to mix the
different skeins quite well and I think I have got enough yarn left to lengthen
the sleeves, knit the ribs and the button bands. Then I will have my usual difficult search
for buttons.
No comments:
Post a Comment